Courses / Commodity Trading Operations & ERP

Logistics and documents — goods move, paper moves money

Trucks, containers and bulk vessels; the documents that trigger payment; and what happens when physical reality disagrees with the paperwork.

Module 3 of 123 lessonsAbout 45 minQuiz: 6 questions
Execute

Lesson 1 · free to read

Three ways goods move, and what each one records

Trucks and railcars into a plant. Grain arriving at a mill is weighed on a scale, sampled and graded, and each load becomes a scale ticket: ticket number, source, gross and tare weight, the bin it was tipped into, and the grade results. Tickets are applied to contracts afterwards. The grains course works one ticket through to settlement in full.

Containers. Coffee, cocoa in bags, spices and packaged food move in containers. The fields a deal needs, as one food sourcing group records them on every order:

  • buy and sell incoterms (they are often different);
  • port of loading and discharge as UN/LOCODE codes, so they can be matched and tracked;
  • ETD and ETA, vessel and voyage;
  • container type (20' standard, 40' high cube, reefer);
  • HS code and country of origin, for customs;
  • shipper and consignee;
  • for food, shelf life.

Container tracking is usually bought per API call. An Asian agricultural trader switches tracking on per transaction to control that cost. When their tracking provider withdrew the product during testing, go-live had to wait for a replacement: a third-party dependency is a go-live dependency.

Bulk vessels. Coal, ore and grain in bulk move on chartered ships. The vocabulary:

  • Laycan: the window in which the vessel must arrive to load, e.g. 15–30 September. Store both dates, not just the month.
  • Nomination: naming the vessel for a shipment.
  • Notice of readiness (NOR) and statement of facts (SOF): the timeline at port, from which laytime is counted.
  • Demurrage: what the charterer pays per day when loading or discharge overruns the laytime allowed.

Quantity is a band. On one bulk scenario (figures re-based) the contract said 60,000 t and the vessel lifted 56,400 t. With a quantity tolerance, the contract quantity is a range, and position, hedging and the credit must all be sized against the range, not a single figure.

The rest of this module

  1. Documents drive money
    The bill of lading date is financial data, and under a letter of credit every document is examined strictly.
  2. When physical reality disagrees with the paperwork
    More arrives than was receipted, bags arrive torn, and rules the business applies with discretion.

Carry on with the course

The other lessons and the quiz are in the course itself, where your progress is saved and counts towards the certificate: Commodity Trading Operations & ERP.

Next module: Invoicing — provisional, final, corrected, and checked